Historical application record
Bridge-Pier Multibeam Survey in Jiujiang
Jiujiang, China
- Survey task
- Survey the underwater bridge-pier area and riverbed approximately 200 m upstream and downstream of Jiujiang Second Yangtze River Bridge.
- System configuration
- iPos MS11 · iBeam8120 · Swiftsvp sound velocity profiler
- In the record
- Measured sensor offsets, installation calibration and cross-sections accompany the 3D point cloud around pier 22.
A documented application of iPos MS11 in a bridge-area multibeam survey.








