A September 2019 field record documents multibeam surveying beneath Jiujiang Second Yangtze River Bridge. The task covered the underwater pier area and adjacent riverbed, with sections and point clouds used to examine the surveyed geometry.

Jiujiang Second Yangtze River Bridge viewed from the riverbank
Jiujiang Second Yangtze River Bridge, the setting for the September 2019 survey.

The measurement setup

System configuration

iPos MS11
Integrated navigation, with position, attitude and time-related information for the survey workflow.
iBeam8120
Multibeam sounding for the underwater terrain and pier-area survey.
Swiftsvp
Sound velocity profiling as part of the measurement setup.

Configuration documented in September 2019. Current hardware, software and integration requirements are reviewed for each project.

FIELD RECORD / 01

Working beneath the bridge

The field record identifies satellite visibility beneath the bridge as a positioning concern. The selected setup combined inertial navigation with multibeam sounding for the bridge-area task.

The documented survey area extended approximately 200 m upstream and downstream. Survey-line spacing was adjusted to the water depth and the intended coverage.

FIELD RECORD / 02

Sensor geometry and installation

The installation record describes measuring the offsets between the GNSS antenna phase centre, the IMU centre and the multibeam transducer. These measurements established the relative sensor positions used in the setup.

The photograph documents the vessel arrangement used for this survey. Mounting positions and offsets need to be established for each vessel and sensor configuration.

Survey vessel with onboard equipment and installation hardware at Jiujiang
The vessel installation recorded at Jiujiang. Sensor offsets were measured before survey work.

FIELD RECORD / 03

Calibration before acquisition

The workflow included roll, pitch and yaw installation calibration using overlapping survey lines. Profile views were inspected to compare the alignment of the survey strips.

The recorded profiles provide a view of this calibration process; they do not establish a quantified navigation error during a GNSS outage.

Overlaid coloured calibration-line profiles from the Jiujiang survey
Calibration-line profile from the source record, used to inspect alignment between survey strips.

FIELD RECORD / 04

Sections and point clouds around pier 22

The record includes sections taken near pier 22 and three-dimensional point-cloud views of its underwater surroundings. HiMAX MBE was used for multibeam data processing and display; the navigation system and its software supported the position, attitude and timing workflow.

These outputs document the measured geometry. Specific damage or structural-condition findings require the corresponding engineering assessment and supporting records.

Cross-section profile alongside a three-dimensional view of the surveyed bridge-pier area
A section near pier 22, shown alongside its position within the surveyed geometry.
Three-dimensional point cloud showing the underwater area around bridge pier 22
Three-dimensional point cloud around pier 22. The view shows the surveyed underwater geometry.

Context & participation

About this record

This historical application record identifies the system configuration, field procedure and survey outputs. It is presented as an application reference; it does not assign an overall project-delivery role to RAYSEN or provide a specified GNSS-outage performance guarantee.